Definition of Terms
The membranes should be laid empty or mechanically fixed on a suitable base layer, adjacent membranes should be reliably connected, and the surrounding roof and perforated parts should be flooded. After all nodes are processed, bricks, walkway boards, aluminum-magnesium-manganese, aluminum plates and other metal roofs are laid on the coiled materials.
System structure
Instructions
System advantages
High reliability: ultra-long service life and durability, providing additional protection for the original roof, extending the life cycle of the building, and low maintenance costs.
Good ease of use: beautiful appearance, fast construction, reliable node processing, excellent waterproof performance, using large rolls to reduce joints.